Test DeepSeek SuperAgent with two tasks in flight
Can a worker ask for missing information while another task moves forward?
Give the workers independent assignments
In a test repository, ask for two small documentation updates. Give the first a complete brief. Leave a release date out of the second and instruct the worker to ask for it. Keep the tickets separate so you can tell which request owns each question.
Inspect both tickets
Answer the date question in its original conversation. Verify that only the matching ticket uses the answer, the first change still completes, and both results link back to the correct request. Record any manual correction needed to untangle the work.
Measure the coordination cost
Compare the parallel run with doing the same tasks one at a time. Count interruptions, time waiting for answers and review time. Two workers finishing sooner helps only if the reviewer can still tell which change belongs to whom.
Read the prototype’s execution and ticket model





